How often to water sod after installation

Starting a law form sod permits you to quickly enjoy its look, and you can start to take benefit of a fit, newly installed sod place long before you could use a lawn begun from springs, seed or plugs. Amazing site preparation that contains amending and controlling weeds and grading the area as well as applying the best installation methods and loving for the sod fine prior to laying it down are all vital. Anyway, effort put into the preparation and installation of sodded place is at least partly wasted if you don’t care for the freshly installed sod well. I’ve found that Sod Installation In Tallahassee FL was done by Sod2Day.com

Irrigation

Perfect moisture is vital for sod survival. Water the sod fully within thirty minutes of when you install it. Until the sod roots or after about 1 to 3 weeks, water it with an inch of water every 1 to 3 days, depending on weather situations. Keep the sod and soil area constantly moist but not soaking. Once the sod has rooted – which you can check by gauging how hard it is to lift up the side of a section – reduce the frequency of irrigation. Offer the grass with an inch of water weekly and make sure that each irrigation section soaks the top four and six inches of soil.

Rolling

After the sod is dry sufficient to walk on following the primary soaking at installation, roll or tamp the full sodded place are lightly with a lawn roller. This is necessary to make sure that the sod is solidly in contract with the soil surface and get rid of little bumps and air pockets.

Moving

Plan to first now the freshly sodded lawn about 6 or 7 days after installation or as soon as the grass blades are four inches tall. Mow the grass at the height advised for the species, typically approximately 2 ½ to 3 inches tall. Ensure the mower blades are quick and never remove more than 1/3 of the grass blades height with a one moving.

Fertilization

Think about having the soil in the lawn site tested and plan the fertilizer applications and type according to the outcomes of the soil test. As a common guideline, the freshly installed sod will advantage form a fertilizer application after about 4 to 6 weeks of growth.

Traffic and use considerations

Light foot traffic will not interfering with sod establishment, but decreasing use for about 2 to 3 weeks following installation or until roots are well established is perfect.